 |
Education Programs
|
|
Program Number
|
Program Name
|
AIA/CES
Credit
|
HSW
Credit
|
Time
(minimum)
|
Learning
Units
|
| AIA 001-CSI |
Introduction to Urethanes in construction
Presented at the Vermont Construction Specifiers Institute conference |
Yes |
Yes |
1 hour |
1 |
|
|
|
|
|
|
AIA 101-R&R
AIA 102-R&R
AIA 103-R&R |
Historic renovation and remediation using polyurethane foam technology
Presented at the Restoration & Renovation 2002 conference |
Yes
Yes
Yes |
Yes |
1 hour |
1 |
|
|
|
|
|
|
AIA201-TVII
AIA202-TVII
AIA203-TVII |
Case study - Ice dam remediation for Northeast Ski-Area Condominiums
Presented at the DOE, ASHRAE, ORNL Thermal Performance of the Exterior Envelopes of Buildings VII (1998) |
Yes
Yes
Yes |
Yes |
1 hour |
1 |
|
|
|
|
|
|
| AIA301-TXI |
Methods for quality assuring high-performance thermal envelopes
Includes paper presented at the SPIE - Thermosense XI International
Symposium on Aerospace/Defense Sensing, Simulation, and Controls. |
Yes |
No |
1 hour |
1 |
|
|
|
|
|
|
BES 401-TXX
BES 402-TXX |
Thermographic inspection and quality assurance of energy conservation procedures for electric buses I, II
Presented at the SPIE - Thermosense XX International Symposium on Aerospace/Defense Sensing, Simulation, and Controls. |
No
No |
No |
1 hour |
|
|
|
|
|
|
|
BES 501-DT
BES 502-DT |
Air leakage testing techniques - I, II
Air leakage in thermal envelopes - methods of locating and preventing air leakage |
No
No |
No |
1 hour |
|
|
|
|
|
|
|
| BES 601-IAQ |
Construction detailing vs. indoor air quality
Indoor air quality |
No |
No |
1 hour |
|
|
|
|
|
|
|
|
Exterior Cavity Wall Applications I, II, & III |
|
|
|
|
| AIA701-Ext |
A General Overview of the Exterior Cavity Wall Approach to Creating High-Performance Building Envelopes - Program number AIA701 |
Yes |
Yes |
1 hours |
1 |
| AIA702-Ext |
Details and Specifications for Cost-effective and Energy-Efficient Exterior Cavity-Wall Applications - Program number AIA702 |
Yes |
Yes |
1 hours |
1 |
| AIA703-Ext |
Exterior Cavity-Wall Applications - The Construction Phase - Program number AIA703 |
Yes |
No |
1 hours |
1 |
|
|
|
|
|
|
| BES 801 |
Basement and Crawlspaces |
|
|
|
|
|
|
|
|
|
|
| AIA 901 |
Building Envelope Commissioning |
Yes |
Yes |
1 hour |
1 |
|
|
|
|
|
|
| BES 1001 |
Mold and Mildew |
No |
No |
1 hour |
|
|
|
|
|
|
|
| BES 1101 |
Unique applications |
No |
No |
1 hour |
|
|
|
|
|
|
|
| BES 1301 |
Design Strategies |
No |
No |
1 hour |
|
|
|
|
|
|
|
| ABAA 101 |
Air Barriers
Basic theory and design |
Yes |
Yes |
1 hour |
1 |
Contact Us
for more information and scheduling opportunities
Right click link and select “Save Target As” if you are using Internet Explorer or “Save Link As” for Netscape. Save the document in the location of your choosing. You will need Adobe
Acrobat
Reader to view and fill out the form. Right
click here to
download course registration form (PDF
document) AIA/CES Provider number H398
|